• Jobs & Careers
  • Investor Center
  • GSE Home
  • Search
GSE Solutions
  • Design & Analysis
      • Design & Analysis
        • Civil & Structural Engineering
        • Electrical / I&C Engineering
        • Fire Protection Engineering
        • Mechanical Engineering
        • All GSE Engineering Services >
      • Core competencies are engineering, project studies and design modifications, but through alliances with our teaming partners, we offer a myriad of related services.

        Watch video >

      • Engineer of Choice Provider - We maintain a deep bench of expertise that includes both bright, promising engineers and staff members with 40 or more years of industry experience.

    • Systems & Simulation
        • Systems & Simulation Solutions
          • High-fidelity Simulators
          • Classroom Simulators
          • Engineering Simulators
          • On-demand Training & Simulations
          • Simulator Upgrades & Maintenance
          • Platforms & Development Tools
          • Advanced Simulation Models
          • All GSE Engineering Services >
        • The most experienced simulation company in the world. Having delivered more full-scope simulators than all of our competitors combined.

          Watch video >

        • December 2022 News - GSE Solutions to Develop First-of-its-kind Hydrogen Plant Model for NuScale Power

          Read more >

      • Programs & Performance
          • Engineering Programs Services
            • ASME Code Programs
            • ASME Section XI Programs
            • Balance of Plant (BOP) Programs
            • Equipment Qualification Programs
            • Engineering Programs Training
            • Nuclear Power Plant Life Extension Services
            • Software (EP-Plus Engage)
          • Thermal Performance Services
            • Data Validation & Reconciliation (DVR)
            • Engineering Analysis & Support
            • Monitoring & Testing Services
            • Program Assessment Services
            • Thermal Performance Training
            • Thermal System Monitoring (TSM)
            • All GSE Engineering Services >
          • True North Consulting is now GSE Engineering, Programs & Performance group. Letter to customers >

        • Training Services
            • Nuclear Operator Training
              • SRO Certifications
              • Classroom Simulators
            • Engineering Programs Training
              • 10 CFR Appendix J
              • Advanced CHECWORKS
              • Appendix III MOV
              • Inservice Inspection (ISI) Programs
              • Inservice Testing (IST) Training
            • Thermal Performance Training
              • Basic Thermal Performance Training
              • Basic Thermal Performance for Fossil
              • Moisture Separator and Reheater Training
            • Training for Process/O&G
              • On-demand Simulation
              • Cloud-based Courses & Tutorials
              • All GSE Workforce Solutions >
            • Our team brings more than 40 years of experience developing training programs for the power generation industry. GSE offers training programs to fit every need, from turn-key to custom programs, to on-demand and certification courses.

              Watch video >

          • Technical Staffing
              • Technical Staffing
                • Nuclear Staffing
                • Thermal/Fossil Staffing
                • Oil & Gas Staffing
                • Renewable Energy Staffing
                • Transmission & Distribution Staffing
                • Vets On Call Program
              • Specialty Consultants
                • Nuclear Operations Specialists
                • Thermal Performance Analysts
                • Procedure Services & Specialists
                • Simulation Specialists
                • Nuclear Training Instructors
                • Design & Maintenance Engineers
                • All GSE Workforce Solutions >
              • GSE experts help identify solutions and talent to address workforce gaps. The GSE Workforce Solutions team will make sure the right people and skills are in place for customer operations to run smoothly.

                Watch video >

            • About
              • About GSE
              • Press Releases
              • Leadership
              • Board Members
              • Investor Center
              • Blogs & Articles
              • Resource Library
            • Contact
            • Menu Menu

            Data, Risk and Turbines

            May 7, 2020/in Thermal Performance, Nuclear, Article

            By Frank Todd, Manager Thermal Performance
            Featured in EnergyTech Magazine

            We all have had to make a decision based on information that we were not quite sure was reliable, knowing that the decision could cost us quite a packet (English slang for a whole lot of money). Do I spend my last 20 paychecks on fixing the septic tank, or do I take the risk when all the relatives come for the 4th of July celebration? At least, that’s what the plumber said. Of course, he would have been wearing a leisure suit and white patent leather shoes if he had been selling me a car. I think he used the word “volcano” some-where in his description.

            This was the case we were faced with at Jersey Jungle Power Station (JJPS). JJPS is located in scenic downtown Jersey Jungle, think Gotham at its worst. Therefore, when the plant manager at the other end of the line said, “We had better be right,” visions of a horse’s head in my bed came to mind.

            Greg Gigawatt was off somewhere in Idaho eating a potato, but I had to have some muscle for this one, so I asked Brian the BTU Buster to jump in his Miata, meet me in the New Jersey office and I’d make him an offer. When going up against JJPS, I needed someone who looked the part. I then put in a call to Jonny Joule, who has a talent for looking tough, but thinking like a pencil neck.

            We arrived at the plant in a black Lincoln Town Car with darkly tinted windows. The three of us exited the car simultaneously looking like the Men in Black. Vito, the plant engineer, took us into the office where there was a distinct smell of gravy (that’s Italian for spaghetti sauce) wafting through the halls. We sat around a large oval table with what looked like trap doors under each specifically colored seat, except for the one at the head of the table. As we sat down, I asked if they would be offended if we took off our sunglasses so we could see the data. In walked the plant manager with a trail of personnel who had the appearance of henchmen.

            “Gentlemen,” said Mr. Gangone, the plant manager, “We are pleased that you have come to help us with our little problem. We have full confidence that you will be able to give us a satisfactory result. Please do not disappoint us.” Brian, Jonny and I looked at each other and gave a simultaneous gulp.

            Vito then laid the facts out before us. The plant had been experiencing a steady decrease in heat rate since its last start up and some of the engineers thought that it might be the turbines. As you know, taking apart the turbine is a very ex-pensive undertaking; therefore it would not be received well if it turned out nothing was wrong. A couple of the tough guys started to sweat. So Mr. Gangone had asked us to bring in some help to verify that it was indeed necessary to open the turbine during the next outage. With summer peak demand approaching, Mr. Gangone needed to recover this lost generation. As we walked out of the room, all three of us knew that we had better get this right!

            Brian asked Vito for the following information to get started on the evaluation:

            • Thermal kit
            • Post outage performance test report
            • Previous turbine outage report
            • The usual set of plant drawings
            • Complete list of available computer points

            Once we looked at the documents, we asked them to provide some historical plant data for evaluation. This data was analyzed and the measured gross load was corrected to standard conditions. The corrected gross load from the 2005 outage was 417 MW and 384 MW for 2007. This is a difference of 33 MW; it is estimated that 26 MW of the 33 MW difference is due to degraded HP efficiency and reduced steam flow through the turbine. The estimated 26 MW could be recovered if the HP turbine efficiency and the steam flow are returned to design. The remaining lost capacity appeared to be a result of higher dummy packing leakage, as well as some IP efficiency issues. Plant data for April 5-6, 2005, and Aug. 13-14, 2007, was analyzed and the measured gross load was corrected to standard conditions.

            HP turbine efficiency was 4.40 percent lower than de-sign after the April 2005 outage, and continued to degrade an additional 3.60 percent to August 2007. The 2007 HP turbine efficiency was 8.00 percent lower than design and indicates the HP turbine condition is degraded.

            The IP turbine efficiencies for 2005 and 2007 were 8.50 percent and 7.70 percent higher than design respectively, and indicated higher than design dummy packing leakage. It was not possible to quantify the amount of the dummy packing leakage with the plant data, and therefore it was not possible to calculate the actual IP turbine efficiency. The actual condition of the IP turbine was unknown, but based on the apparent degradation of the HP turbine as indicated by the reduction of the HP turbine efficiency, it was probable that some degradation had occurred to the condition of the IP turbine as well.

            The boiler feedwater flow in 2007(2,972,091 lb/hr) was 14 percent lower than design (3,014,900 lb/hr) and 6 percent lower than the 2005 (3,170,125 lb/hr) boiler feedwater flow. The 2005 boiler feedwater flow measurement was 5 percent higher than design and therefore the measurement was sus-pected to be in error. The 1st stage pressure is an indicator of flow through the turbine. The 2005 1st stage pressure (1,756 psia) is essentially at design (1,764 psia). The 2007 1st stage pressure (1,666 psia) is 5 percent lower than design, and the 2005 1st stage pressure. It appeared that from the 2005 outage to the 2007 outage, the turbine flow passing area had decreased, resulting in a reduction of steam flow through the turbine. The likely cause of the decreased flow passing area was deposits in the turbine.

            So after we quadruple checked the data, amassed an arsenal of graphs, tables and charts and dramatically increased our life insurance policies, we walked back into the big room with the trap doors under the chairs. Mr. Gangone walked in, sat down and started fiddling with this array of push buttons that were the
            color of each of our chairs. (We hadn’t noticed that feature before.)

            “Gentlemen, you have had a few days to review our situation and I am hoping that you have some good news for me” Mr. Gangone said. Brian and Jonny looked over at me with a distinct look of dread, so I waded in.

            “Mr. Gangone,” I said in the most confident Italian sounding voice I could muster, “We believe that we have identified the possible problems with your plant efficiency and have the following observations recommendations:

            • Reduction of steam flow through the turbine as indicated by the reduction of the boiler feedwater flow measurement and the 1st stage pressure measurement. Reduction of steam flow through the turbine is likely caused by a reduction in the flow passing area due to deposits.
            • Degradation in the condition of the HP turbine as indicated by the reduction of the HP turbine efficiency. HP turbine degradation causes could be deposits, spill strip damage, inter-stage packing damage and foreign object damage.
            • Dummy packing leakage higher than design, as indicated by the higher than design IP efficiency. Higher than design dummy packing leakage is caused by damaged dummy packing.
            • Degradation in the condition of the IP turbine is suspected, although the actual IP efficiency is unknown due to the higher than design dummy packing leakage. IP turbine degradation causes could be deposits, spill strip damage, inter-stage packing damage and foreign object damage.”

            I added, “We recommend that at the next HP IP turbine outage, they inspect, clean and repair the HP and IP steam path, including inspection and repair of the dummy packing. We believe that this is an accurate evaluation and are willing to stake our reputations on it.”

            Mr. Gangone told us he appreciated our work and was also willing to stake our reputations – among other things – on it. So a few months later, when we received a rather suspicious looking package from JJPP, it was opened with more than a slight bit of fear and trepidation. However it turned out to be a collectors’ edition of “The Godfather,” so we knew things came out well.

            Jersey Jungle Station had just completed its outage and inspected the HP IP turbine. The HP IP turbine was found to have considerable deposits throughout. HP turbine spill strips were damaged.

            HP turbine inter-stage packing was rubbed and the teeth were flattened. The upper and lower IP dummy packing was found to be heavily damaged; the
            packing was badly rubbed and the teeth were flattened. The IP turbine was found to have considerable deposits throughout. IP turbine spill strips were damaged and IP turbine inter-stage packing was rubbed and the teeth flattened.

            During this outage Jersey Jungle Station performed the following:

            • Removed the deposits from the HP IP blades and blade rings
            • Repaired the HP dummy packing
            • Replaced spill strips
            • Replaced IP dummy packing

            When they got back to power, JJPS had returned to normal and we could all sleep a little easier. As engineers, our job sometimes calls for a little bit of risk taking. It is important that we take the time to evaluate the data well enough to reduce the risk as much as possible. But there will always be some amount of risk involved. Fortunately for us, on this job none of our wives collected on those big insurance policies we took out.

            Mr. Megawatt is Frank Todd, manager of Thermal Performance for GSE TrueNorth. TrueNorth serves the power industry in the areas of testing, training and plant analysis. Todd’s career, spanning more than 30 years in the power generation industry, has been centered on optimization, efficiency and overall Thermal Performance of power generation facilities.

            Share this entry
            • Share on Facebook
            • Share on Twitter
            • Share on WhatsApp
            • Share on LinkedIn
            • Share by Mail
            https://tnorthconsulting.com/wp-content/uploads/2020/01/EnergyTech-1.png 648 863 Sunny Demattio https://gses.com/wp-content/uploads/2022/11/GSE-Solutions_tag-22a.png Sunny Demattio2020-05-07 18:00:222021-03-24 15:30:41Data, Risk and Turbines

            Categories

            • BOP Blog Series
            • Staffing & Training Blog
            • EnVision Blog Series
            • Engineering
            • Thermal Performance
            • Uncategorized
            • Nuclear
            • Simulation
            • Thermal/Fossil
            • Blog
            • Oil & Gas
            • CCGT
            • Staffing
            • Article
            • Training

            Archive

            • 2021
            • 2020
            • 2019
            • 2018
            • 2017
            • 2016
            GSE Solutions
            © 2023. All rights reserved.
            Privacy Policy

            Navigation

            • Investor Center
            • Jobs & Careers
            • Contact Us
            • Press Releases
            • Follow Us on LinkedIn

            Contact Us

            Emergency Diesel Generators Preventative Maintenance Cost SavingsOnline Distance Learning for Operators and Engineers is the Easy Alternativ...
            Scroll to top

            This site uses cookies to improve your browsing experience; the website may not work as expected without them. By continuing to browse this site, you consent to the use of cookies.

            OKLearn More

            Cookie and Privacy Settings



            How we use cookies

            We may request cookies to be set on your device. We use cookies to let us know when you visit our websites, how you interact with us, to enrich your user experience, and to customize your relationship with our website.

            Click on the different category headings to find out more. You can also change some of your preferences. Note that blocking some types of cookies may impact your experience on our websites and the services we are able to offer.

            Essential Website Cookies

            These cookies are strictly necessary to provide you with services available through our website and to use some of its features.

            Because these cookies are strictly necessary to deliver the website, refusing them will have impact how our site functions. You always can block or delete cookies by changing your browser settings and force blocking all cookies on this website. But this will always prompt you to accept/refuse cookies when revisiting our site.

            We fully respect if you want to refuse cookies but to avoid asking you again and again kindly allow us to store a cookie for that. You are free to opt out any time or opt in for other cookies to get a better experience. If you refuse cookies we will remove all set cookies in our domain.

            We provide you with a list of stored cookies on your computer in our domain so you can check what we stored. Due to security reasons we are not able to show or modify cookies from other domains. You can check these in your browser security settings.

            Other external services

            We also use different external services like Google Webfonts, Google Maps, and external Video providers. Since these providers may collect personal data like your IP address we allow you to block them here. Please be aware that this might heavily reduce the functionality and appearance of our site. Changes will take effect once you reload the page.

            Google Webfont Settings:

            Google Map Settings:

            Google reCaptcha Settings:

            Vimeo and Youtube video embeds:

            Privacy Policy

            You can read about our cookies and privacy settings in detail on our Privacy Policy Page.

            Accept settingsHide notification only